Installation testing and handoff
Decide together which checks count as acceptance and how the results will be shared.

What to verify
- Copper cablingMatch results from the agreed certification or verification procedure to each port label.
- Fiber linksRecord the agreed optical loss measurements and identify any exceptions for follow-up.
- Wireless coverageValidate priority areas and document coverage gaps in the operating layout.
- Equipment and AVConfirm agreed connections, controls and a representative operating scenario.
What do we receive at handoff?
The agreed test records, labels and installation documentation for your scope.
When should we set acceptance criteria?
Set them when planning the job and confirm them before installation begins.