Installation testing and handoff

Decide together which checks count as acceptance and how the results will be shared.

Illustration of a technician reviewing test results with an IT manager

What to verify

  1. Copper cablingMatch results from the agreed certification or verification procedure to each port label.
  2. Fiber linksRecord the agreed optical loss measurements and identify any exceptions for follow-up.
  3. Wireless coverageValidate priority areas and document coverage gaps in the operating layout.
  4. Equipment and AVConfirm agreed connections, controls and a representative operating scenario.
What do we receive at handoff?

The agreed test records, labels and installation documentation for your scope.

When should we set acceptance criteria?

Set them when planning the job and confirm them before installation begins.

Explore planning guides

Free Site Visit & Consultation

Fast estimates and same-day quotes are available when we have enough detail to price the work. Tell us about your site and what you need installed.

[email protected]

Cable routing plan and installation tools

What to have ready

Have the project address, property type, target date, and a floor plan or site photo ready. If you have multiple sites, include the site count and any differences in scope.