The Network
Installer
← All articles

What to prepare for a CCTV cabling project

Installer and site contact reviewing a camera location beside a loading bay

Map camera locations

Mark each position and the area it should cover. Note mounting height, access restrictions and routes back to the network closet.

Confirm the equipment

List each model, whether it draws Power over Ethernet, and the recorder or video platform. Have the site team verify device compatibility and any procurement requirements.

Plan installation and acceptance

Agree on which party checks framing, connectivity and recording at handoff. Provide a camera ID and switch port for each location.

Ethernet installation · Related planning guide

Request a Quote

Free Site Visit & Consultation

Fast estimates and same-day quotes are available when we have enough detail to price the work. Tell us about your site and what you need installed.

[email protected]

Cable routing plan and installation tools

What to have ready

Have the project address, property type, target date, and a floor plan or site photo ready. If you have multiple sites, include the site count and any differences in scope.